While working on VIDA Senior Housing, groundwater rose into every hole we dug, due to the sub-standard soils, and would not flow horizontally into our dewatering system as planned. We could spot-pump the water out of the holes, but we needed our dewatering system to perform as originally designed.
We dug three detention wells at the biggest-problem areas 20bet casino loginand used sump pumps to move the water out of the wells, through a filtration system, and into our dewatering system. But with the problematic soils, the pumps kept going out, causing water disposal issues.
A quote from a third-party groundwater remediation service for managing this issue came in at $1.3 million. Pinkard knew there was a better solution.